CityTN
Jul 9, 2026
Closes
Aug 21, 2026
Concrete Improvements - Atoka Fire Station #2 - (RFP)
The project generally consists of the removal of existing asphalt, site preparation, and installation of reinforced concrete.
Description: Work includes removal of the existing 8" concrete pavement and associated curb and gutter. Removal of existing aggregate and subgrade to establish the required pavement section of 12| aggregate subbase and 8" air entrained, macrofiber reinforced concrete (4000 pound-force per square inch [psi]) pavement for the existing northern driveway. The dosage for macrofibers will be five (5) pounds per cubic yard. This will be in two (2) phases to allow access for the emergency crew. See attached file.
City · VA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityTN
Jul 9, 2026
Closes
Aug 21, 2026
The project generally consists of the removal of existing asphalt, site preparation, and installation of reinforced concrete.
CityTX
Aug 5, 2026
Closes
Aug 25, 2026
The City of Edinburg Fire Department seeks proposals from licensed contractors to design, engineer, permit, and install code-compliant automatic fire sprinkler systems at Fire Stations 1 and 3. The work covers an overhead system and connected alarms at the 18,000-square-foot Station 1, plus a new sprinkler and fire-alarm system, water-line connection, underground work, plans, hydraulic calculations, permits, and related ceiling and electrical work at the 6,000-square-foot Station 3. The project is FEMA-funded, proposals are due electronically on August 25, 2026, at 3:00 p.m. Central Time, and bidder questions are due August 19, 2026, at 12:00 a.m. Central Time.
CityTX
Aug 5, 2026
Closes
Aug 25, 2026
The City of Edinburg Fire Department seeks proposals from licensed contractors to design, engineer, permit, and install code-compliant automatic fire sprinkler systems at Fire Stations 1 and 3. The work covers an overhead system and connected alarms at the 18,000-square-foot Station 1, plus a new sprinkler and fire-alarm system, water-line connection, underground work, plans, hydraulic calculations, permits, and related ceiling and electrical work at the 6,000-square-foot Station 3. The project is FEMA-funded, proposals are due electronically on August 25, 2026, at 3:00 p.m. Central Time, and bidder questions are due August 19, 2026, at 12:00 a.m. Central Time.
CityCA
Jul 8, 2026
Closes
Aug 26, 2026
Work generally consists of demolition of the existing station, furnishing and installing a fully operational temporary living and operating quarters, and construction of the new leed gold station. Work includes demolition (as applicable) erosion control; drill piers caps & beams slab on grade cooling tower basin misc bldg conc floor sealer rebar matl rebar labor lt. Wt. Insul fill - materials; masonry brickwork - labor brickwork - matls concrete masonry - labor concrete masonry - materials str. Glazed tile-labor str. Glazed tile-materials submittals/closeout documents supervision clean-up. See outside link.
Procurement and program contacts connected to City of Fredericksburg.