CityTX
Posted
-
Oct 15, 2026
New Fire Station
Construction of a new 13,634 SF, concrete foundation, steel frame and joist/truss roof structure fire station buiding with metal stud framed exterior walls with stucco finish.
Description: The City of Hope, Arkansas is soliciting sealed bids for construction of a new fire station and related materials, labor, equipment, and supervision. The official detail page lists the posting as Open, published 9/20/2026, with a displayed due date of 10/14/2026 at 6:00 PM; the notice text separately says bids will be received until 2:00 P.M. on October 14, 2026. Plans and specifications may be examined at City Hall, and contract documents are available through Capitol Blueprint; the posting is a construction solicitation, not a grant program.
City · AR, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityTX
Posted
-
Oct 15, 2026
Construction of a new 13,634 SF, concrete foundation, steel frame and joist/truss roof structure fire station buiding with metal stud framed exterior walls with stucco finish.
CitySC
Posted
-
Aug 27, 2027
This is a construction procurement for a qualified and licensed general contractor to provide the labor, materials, equipment, supervision, permitting, and construction services needed for Fire Station 82. The project is a turnkey new fire station at 801 Village Drive in Okatie, South Carolina, including associated site improvements and compliance with plans, specifications, codes, and regulations. It uses a design-bid-build delivery method, has an estimated construction cost range of $5,000,000 to $10,000,000, and is an active contract opportunity rather than a grant program.
CityMA
Posted
Mar 18, 2026
Dec 31, 2026
This is a Request for Quotation (RFQ) for Fire Station 1 Operations & Maintenance (OPM) for the Town of Westwood, MA. The solicitation includes equipment, supplies, maintenance services, and programmatic documentation, with two addenda already posted. The RFQ opened on March 18, 2026, and remains active as the close date is currently listed as TBD.
CityMN
Posted
Sep 8, 2026
Oct 23, 2026
A developer or business to reuse or redevelop the City’s former fire station.
Decision makers connected to this RFP from City of Hope.