CityTX
Aug 5, 2026
Closes
Aug 25, 2026
Fire Sprinkler System Design and Installation for Fire Station 1 and 3
The City of Edinburg Fire Department seeks proposals from licensed contractors to design, engineer, permit, and install code-compliant automatic fire sprinkler systems at Fire Stations 1 and 3. The work covers an overhead system and connected alarms at the 18,000-square-foot Station 1, plus a new sprinkler and fire-alarm system, water-line connection, underground work, plans, hydraulic calculations, permits, and related ceiling and electrical work at the 6,000-square-foot Station 3. The project is FEMA-funded, proposals are due electronically on August 25, 2026, at 3:00 p.m. Central Time, and bidder questions are due August 19, 2026, at 12:00 a.m. Central Time.