Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Union High School
Project scope includes replacing existing fire alarm system in its entirety with new voice evacuation fire alarm system. Existing fire alarm system shall be fully operational throughout all phases of construction. Demolish existing system once new system is installed, tested. Existing field device locations shall be reused whenever possible. Install new fire alarm system speaker as specified for voice evacuation. Portable buildings are included in scope.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
NJ Division of Property Management & Construction
Work includes fire alarm system replacement.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
NJ Division of Property Management & Construction
Close: Jan 8, 2026
Work includes fire alarm system replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Vermont Department of Buildings and General Services
State of Vermont solicitation for replacement of the fire alarm system at 32 Cherry Street, including removal and replacement of the existing fire alarm panel, devices, and wiring. The contractor must supply all labor, materials, and equipment per drawings/specifications, comply with Vermont prevailing wage requirements, and the project is expected to be funded through Vermont Capital Construction Act funds.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Vermont Department of Buildings and General Services
Close: Dec 17, 2025
State of Vermont solicitation for replacement of the fire alarm system at 32 Cherry Street, including removal and replacement of the existing fire alarm panel, devices, and wiring. The contractor must supply all labor, materials, and equipment per drawings/specifications, comply with Vermont prevailing wage requirements, and the project is expected to be funded through Vermont Capital Construction Act funds.
AvailableAir Combat Command
DESIGN-BUILD - service to replace the antiquated fire alarm system.
Posted Date
Oct 17, 2025
Due Date
Jan 20, 2026
Release: Oct 17, 2025
Air Combat Command
Close: Jan 20, 2026
DESIGN-BUILD - service to replace the antiquated fire alarm system.
AvailableCity of Pembroke Pines
To replace the fire alarm system.
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
City of Pembroke Pines
Close: Dec 23, 2025
To replace the fire alarm system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →