Closing soon

Fire Alarm Panel Replacement(s) RFP

Description: Remove all components of existing FACP at FOD & NBP and reuse existing input and output wiring at the FACP boxes. Provide new batteries in panel boxes. Fully test the panel and the communication with all devices. “Bring-in” every device on all floors of the Folsom Dam & NBP to ensure functionality and sequencing according to the programming and as required by the NFPA. Adjust the programming at the panel as necessary. All work is localized at the panel except during testing when devices need to be initiated to determine functionality. The panels at both sites (FOD/NBP) must have remote notification/annunciation capability to Folsom power Plant control room desk via outputs from panel. Connections to CVACS will be made by CCAO staff. All other work shall be completed by the contractor except during the testing phase. It is recognized that testing is a multiple individual operation. Reclamation will provide the necessary individuals to assist the Contractor during testing.

Buyer
Released
Nov 3, 2026
Closes
Nov 17, 2026(7 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts