Aug 14, 2026
Closes
Sep 15, 2026
Ft. Leavenworth Fire Alarm and Mass Notification System Upgrade, $45M, 5 Year SATOC RFP
Fire alarm and mass notification system upgrade.
Description: Replace/combine the existing fire alarm controls (Gamewell),mass notification/voice evacuation (Federal Signal), and radio transceiver (King Fisher) into onepanel for each building/warehouse (~49 ea). Contractor will also replace the existing centralreceiving system in the Central Dispatch (Building 235) to receive signal from the new panels,including a backup receiving system in Building 100.
Federal · CA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Aug 14, 2026
Closes
Sep 15, 2026
Fire alarm and mass notification system upgrade.
Housing Authority of the Borough of Collingswood
Special DistrictNJ
Aug 14, 2026
Closes
Sep 9, 2026
Generally, the work includes, but is not limited to, replacing the existing fire alarm panels with new updated panels, installing some new detectors, and relocating some detectors for Code compliance. All existing wiring is to remain. New detectors are to be wired from adjacent detectors.
Massachusetts Convention Center Authority
State AgencyMA
Jul 1, 2026
Closes
Aug 25, 2026
Work of this project in Springfield, Massachusetts includes, but is not necessarily limited to, Fire Alarm Upgrades (T24A): The scope of this work is upgrading the existing fire alarm system at the MMC. The existing fire alarm system is currently utilizing an EST-3 FACP. As part of this project this panel shall be upgraded to an EST-4 Voice Evac FACP installed within the same backbox. A FireWorks Workstation with a 55” touchscreen display will be added to the security room, and the existing annunciator is to be replaced with new. All existing initiating and signaling devices throughout the building shall be replaced with modernized addressable equivalents. The existing smoke control system is currently monitored and controlled through the Building Management System (BMS). As part of this project, the smoke control system controls shall be transferred from the existing BMS to the Fire Alarm System (FAS) to improve system reliability, supervision, and emergency response functionality. BMS Upgrades (T26A): The scope of this work is upgrading the Building Management System at the MMC. The work generally includes a new front-end system including but not limited to removal of all existing controllers and equipment associated with the antiquated head-end system, which shall be replaced with a new head-end system that will be tied into the existing equipment, sensors, etc. The new BMS would serve all equipment across both the Arena and Convention Center portions of the building. This project will include the implementation of various controls-based energy conservation measures (ECMs) concurrent with the BMS replacement. The smoke control system will be migrated from BMS control to fire alarm control as part of this project.
Tennessee Real Property Administration
State AgencyTN
-
Closes
Sep 17, 2026
The project includes replacing the existing fire alarm systems in Administration Building, Guilds, Annex Administration and Kitchen/Dining, Dorms, Education Building, and Industrial Building with new addressable fire alarm systems.
Procurement and program contacts connected to U.S. Army Engineer District Sacramento.