Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The installation of new equipment, initial configuration, system setup, training and technical assistance. The main components of the suite level flooring replacement project are detailed below. Vendors responding to this solicitation should be prepared to provide each component, and add any additional components deemed necessary to successfully complete the project. Vendors responding will also be responsible for providing any permits, plans, engineering or inspections required for the proper installation of equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Sealed bids sought for suite-level carpet replacement at the Resch Center (Green Bay, WI). Scope: remove/dispose existing corridor carpet and baseboard, remove adhesive, install Philadelphia Commercial Interlace 54980 carpet tiles (color 00512, tiles ≤18×36), install carpet baseboard (4") and transition/trim, include elevator landings; work may be phased. Procurement requirements: mandatory pre-bid site visit, sealed hard-copy submission using County cost sheet, Bidder's Proof of Responsibility must be submitted ≥5 days before opening, include Bidder's Certificate and addendum acknowledgement if applicable. Selection: lowest responsible bidder. Bond/insurance: no bid bond required if < $50,000; 5% bid bond and performance/payment bond required for bids ≥ $50,000 (higher requirements if > $100,000); standard County insurance/additional-insured requirements apply.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Sealed bids sought for suite-level carpet replacement at the Resch Center (Green Bay, WI). Scope: remove/dispose existing corridor carpet and baseboard, remove adhesive, install Philadelphia Commercial Interlace 54980 carpet tiles (color 00512, tiles ≤18×36), install carpet baseboard (4") and transition/trim, include elevator landings; work may be phased. Procurement requirements: mandatory pre-bid site visit, sealed hard-copy submission using County cost sheet, Bidder's Proof of Responsibility must be submitted ≥5 days before opening, include Bidder's Certificate and addendum acknowledgement if applicable. Selection: lowest responsible bidder. Bond/insurance: no bid bond required if < $50,000; 5% bid bond and performance/payment bond required for bids ≥ $50,000 (higher requirements if > $100,000); standard County insurance/additional-insured requirements apply.
AvailableRFP for the replacement of doors and windows at the Founders Park Ron Levy Aquatic Center.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
RFP for the replacement of doors and windows at the Founders Park Ron Levy Aquatic Center.
AvailableWork consists of remove and safely dispose of existing flooring and installation of new flooring.
Posted Date
Sep 30, 2025
Due Date
Jan 7, 2026
Release: Sep 30, 2025
Close: Jan 7, 2026
Work consists of remove and safely dispose of existing flooring and installation of new flooring.
AvailableProvide elementary school flooring replacement.
Posted Date
Dec 6, 2025
Due Date
Jan 15, 2026
Release: Dec 6, 2025
Close: Jan 15, 2026
Provide elementary school flooring replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis