Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform fiberglass reinforced plastic (FRP) tank inspection, relining and general repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Relining of fiberglass chlorite tank and flange repairs or replacement. The repairs are to reline the interior of the tank floors, walls, manways, flanges and sealing of all leaks. The work for this project shall be executed in the best and most competent manner and certified efficient mechanics/tradesman, skilled in their respective trade.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Relining of fiberglass chlorite tank and flange repairs or replacement. The repairs are to reline the interior of the tank floors, walls, manways, flanges and sealing of all leaks. The work for this project shall be executed in the best and most competent manner and certified efficient mechanics/tradesman, skilled in their respective trade.
Premium
Access the largest public sector contact database
Work includes a 2,500-gallon fiberglass reinforced, HDPE or plastic replacement tank for the failing Sludge Holding Tank and associated PVC piping and ball valves for the waste sludge piping, decant and drainage piping, aeration piping and diffusers.
Posted Date
Dec 1, 2025
Due Date
Dec 30, 2025
Release: Dec 1, 2025
Close: Dec 30, 2025
Work includes a 2,500-gallon fiberglass reinforced, HDPE or plastic replacement tank for the failing Sludge Holding Tank and associated PVC piping and ball valves for the waste sludge piping, decant and drainage piping, aeration piping and diffusers.
AvailableProduces reclaimed water through the wastewater treatment process and distributes this non-potable water throughout the city from the distribution pump station (dps) a condition assessment performed in 2022 by a consultant on the surge tank included a visual inspection and evaluations of the coating s condition and thickness throughout the tank by taking dry-film thickness readings and performing ultrasonic thickness testing. It was found that rust and blisters within the coating had delaminated the interior coating from the steel surface of the tank. The consultant made recommendations on what was needed to address the internal coating failures as well as guidance on performing inspections on a 3-to-5-year cycle.
Posted Date
-
Due Date
Jan 7, 2026
Release: -
Close: Jan 7, 2026
Produces reclaimed water through the wastewater treatment process and distributes this non-potable water throughout the city from the distribution pump station (dps) a condition assessment performed in 2022 by a consultant on the surge tank included a visual inspection and evaluations of the coating s condition and thickness throughout the tank by taking dry-film thickness readings and performing ultrasonic thickness testing. It was found that rust and blisters within the coating had delaminated the interior coating from the steel surface of the tank. The consultant made recommendations on what was needed to address the internal coating failures as well as guidance on performing inspections on a 3-to-5-year cycle.
AvailableFor underground and aboveground storage tank inspection and maintenance.
Posted Date
Oct 23, 2025
Due Date
Jan 5, 2026
Release: Oct 23, 2025
Close: Jan 5, 2026
For underground and aboveground storage tank inspection and maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis