Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Produces reclaimed water through the wastewater treatment process and distributes this non-potable water throughout the city from the distribution pump station (dps) a condition assessment performed in 2022 by a consultant on the surge tank included a visual inspection and evaluations of the coating s condition and thickness throughout the tank by taking dry-film thickness readings and performing ultrasonic thickness testing. It was found that rust and blisters within the coating had delaminated the interior coating from the steel surface of the tank. The consultant made recommendations on what was needed to address the internal coating failures as well as guidance on performing inspections on a 3-to-5-year cycle.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Produces reclaimed water through the wastewater treatment process and distributes this non-potable water throughout the city from the distribution pump station (dps) a condition assessment performed in 2022 by a consultant on the surge tank included a visual inspection and evaluations of the coating s condition and thickness throughout the tank by taking dry-film thickness readings and performing ultrasonic thickness testing. It was found that rust and blisters within the coating had delaminated the interior coating from the steel surface of the tank. The consultant made recommendations on what was needed to address the internal coating failures as well as guidance on performing inspections on a 3-to-5-year cycle.
Posted Date
-
Due Date
Jan 7, 2026
Premium
Access the largest public sector contact database
Close: Jan 7, 2026
Produces reclaimed water through the wastewater treatment process and distributes this non-potable water throughout the city from the distribution pump station (dps) a condition assessment performed in 2022 by a consultant on the surge tank included a visual inspection and evaluations of the coating s condition and thickness throughout the tank by taking dry-film thickness readings and performing ultrasonic thickness testing. It was found that rust and blisters within the coating had delaminated the interior coating from the steel surface of the tank. The consultant made recommendations on what was needed to address the internal coating failures as well as guidance on performing inspections on a 3-to-5-year cycle.
AvailableProvide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 12, 2025
Release: Jul 16, 2025
Close: Dec 12, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Perform fiberglass reinforced plastic (FRP) tank inspection, relining and general repairs.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Perform fiberglass reinforced plastic (FRP) tank inspection, relining and general repairs.
AvailableThe City of Leander is soliciting sealed bids for construction of a new booster pump station and a prestressed concrete ground storage tank at 16092 Ronald W Reagan Blvd, Leander, TX 78641. The work includes earthwork plus structural, mechanical, and electrical elements to supply water to the 1127 pressure zone and the San Gabriel Elevated Storage Tank project.
Posted Date
Dec 4, 2025
Due Date
Feb 12, 2026
Release: Dec 4, 2025
Close: Feb 12, 2026
The City of Leander is soliciting sealed bids for construction of a new booster pump station and a prestressed concrete ground storage tank at 16092 Ronald W Reagan Blvd, Leander, TX 78641. The work includes earthwork plus structural, mechanical, and electrical elements to supply water to the 1127 pressure zone and the San Gabriel Elevated Storage Tank project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis