Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of fiber link installation and legacy cable decommissioning. Includes, cable removal: complete demolition and cleanup of legacy coaxial and telecom systems, starting from the main closet and extending to all associated rooms. All cabling and related infrastructure must be fully removed from the closet to the rooms. Fiber patch panel: installation of a new enclosure to house both existing and new fiber connections, located adjacent to the demarcation closet. Fiber link: install a new 42-strand single-mode fiber link between room a107g and room a201k. The total length of the fiber run is approximately 140 feet. This installation should include all necessary components to interconnect both. Install low-voltage cat6 cabling from room a107g to room a201k, totaling 12 ethernet runs, each approximately 140 feet in length.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Meriden is soliciting sealed electronic proposals from qualified contractors to install four (4) 4-inch underground conduits running from 142 East Main Street to 175 East Main Street in Meriden, CT to facilitate fiber optic cable deployment. The contract period of performance is short (beginning December 3, 2025 and concluding December 23, 2025) and the solicitation is open to all vendors.
Posted Date
Dec 3, 2025
Due Date
Dec 23, 2025
Release: Dec 3, 2025
Close: Dec 23, 2025
The City of Meriden is soliciting sealed electronic proposals from qualified contractors to install four (4) 4-inch underground conduits running from 142 East Main Street to 175 East Main Street in Meriden, CT to facilitate fiber optic cable deployment. The contract period of performance is short (beginning December 3, 2025 and concluding December 23, 2025) and the solicitation is open to all vendors.
AvailableMdu fiber installation labor for ftth project. From budi box to each hallway point of entry box.
Posted Date
Oct 16, 2025
Due Date
Jan 12, 2026
Release: Oct 16, 2025
Close: Jan 12, 2026
Mdu fiber installation labor for ftth project. From budi box to each hallway point of entry box.
AvailableChapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Purchase 48 and 96 strand armored fiber optic cable for the city traffic management communication system.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Purchase 48 and 96 strand armored fiber optic cable for the city traffic management communication system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Dec 18, 2025
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
Available