Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
241-Network Contract Office 01 (36C241)
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
United States Department of Veterans Affairs Police Department
The Department of Veterans Affairs is conducting market research to identify parties interested in and capable of providing Special Mode/Wheelchair Van Transportation Services for Veteran Beneficiaries at the Bedford VA Medical Center. The services will include approximately 1,000 one-way trips per month.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
United States Department of Veterans Affairs Police Department
Close: Jan 15, 2026
The Department of Veterans Affairs is conducting market research to identify parties interested in and capable of providing Special Mode/Wheelchair Van Transportation Services for Veteran Beneficiaries at the Bedford VA Medical Center. The services will include approximately 1,000 one-way trips per month.
AvailableAir Force Global Strike Command
Provide cable installation. The contractor shall provide personnel/labor for Outside and Inside Plant cable installation, surveys, and maintenance.
Posted Date
Dec 8, 2025
Due Date
Dec 16, 2025
Release: Dec 8, 2025
Air Force Global Strike Command
Close: Dec 16, 2025
Provide cable installation. The contractor shall provide personnel/labor for Outside and Inside Plant cable installation, surveys, and maintenance.
AvailableCity of Meriden
The City of Meriden is soliciting sealed electronic proposals from qualified contractors to install four (4) 4-inch underground conduits running from 142 East Main Street to 175 East Main Street in Meriden, CT to facilitate fiber optic cable deployment. The contract period of performance is short (beginning December 3, 2025 and concluding December 23, 2025) and the solicitation is open to all vendors.
Posted Date
Dec 3, 2025
Due Date
Dec 23, 2025
Release: Dec 3, 2025
City of Meriden
Close: Dec 23, 2025
The City of Meriden is soliciting sealed electronic proposals from qualified contractors to install four (4) 4-inch underground conduits running from 142 East Main Street to 175 East Main Street in Meriden, CT to facilitate fiber optic cable deployment. The contract period of performance is short (beginning December 3, 2025 and concluding December 23, 2025) and the solicitation is open to all vendors.
AvailableCity of Wyandotte
Mdu fiber installation labor for ftth project. From budi box to each hallway point of entry box.
Posted Date
Oct 16, 2025
Due Date
Jan 12, 2026
Release: Oct 16, 2025
City of Wyandotte
Close: Jan 12, 2026
Mdu fiber installation labor for ftth project. From budi box to each hallway point of entry box.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis