Retrieving RFP details
Release
Close
Massachusetts Water Resources Authority
Purpose of the Farm Pond Inlet Chamber Repair project is to permanently eliminate the existing connection between Farm Pond and the Sudbury Aqueduct by filling in the inlet channels with concrete.
OP-500
docx
Montgomery County Utility District 4
Pond Erosion Repair.
City and County of Broomfield
Seeking contractor to remove and replace two failing inlet structures. Approx 55 LF of 24" RCP; 1 EA of Manhole (5' DIA, 10ft Height); 1 EA of 24" FES; 253 of CY Top Soil, Import (4" depth).
Central Texas Regional Mobility Authority
project will upgrade the existing WQ pond bedding from stone riprap to concrete riprap, replaces existing gabions and maintains the berms & sand filtration pond. 599 CY 6 Install 5" Concrete Riprap with toe wall; 1,135 SY 7 Excavation of Sand Filter Bed (4"); Setup Erosion Control;
Release
Oct 31, 2025
Close
Dec 01, 2025