North Tahoe Fire Protection Dist
Special DistrictCA
Posted
Oct 27, 2025
Dec 31, 2099
Propane Tank Installation Plan Check
The RFP is for the plan review, inspection, and permitting of residential and commercial propane tank installations.
Description: Fresno Unified School District seeks bids to install a new buffer tank in the chilled-water return piping to chillers at Farber Educational Campus. This is a construction procurement, not a grant program. Bids close November 17, 2026, and the solicitation documents are available through the district’s procurement portal.
SchoolDistrict · CA, US
Adjacent opportunities open for bidding right now.
North Tahoe Fire Protection Dist
Special DistrictCA
Posted
Oct 27, 2025
Dec 31, 2099
The RFP is for the plan review, inspection, and permitting of residential and commercial propane tank installations.
Higher EducationNY
Posted
Sep 30, 2026
Oct 29, 2026
Renovate farber 2 disciplinary excellence.
Posted
Oct 20, 2026
Oct 29, 2026
Work includes abatement/demo, masonry, steel, roofing, glass, doors, carpentry, flooring, painting, specialties, M/E/Ps, etc.
University Of Wisconsin Madison
Higher EducationWI
Posted
Aug 25, 2026
Nov 5, 2026
The University of Wisconsin System's Construction Projects page lists Campus Wide Access Controls Installation 3 for UW-Madison at 803 State Street, Madison, WI, under UWSA Project No. A-24-005 and Madison Project No. 0679-2419. It gives a $1,337,000 construction estimate, an October 8, 2026 bid-document question deadline, an MEP bid deadline of October 22, 2026 at 1:30pm CT, and a GPC bid deadline of November 5, 2026 at 1:30pm CT. The page shows Date Posted: August 25, 2026; it is presented under Construction Projects as a procurement opportunity rather than a grant, and no primary bid file is linked in the package-3 block.
Decision makers connected to this RFP from Fresno Unified School District.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
Fresno Unified's 2023/24 Bond Annual Report recorded a Measure M programme for heating and air-conditioning upgrades and other facility work, with district projects continuing to be designed and bid.
# 2023/24 Bond Annual Report  This annual report, for the period July 1, 2023 through June 30, 2024, is presented on behalf of the Fresno Unified Citizens' Bond Oversight Committee in accordance with the Committee's Bylaws. ## Bond Measure M Measure M, approved by 60% of the voters in March 2020, authorizes the issuance of $325…
Fresno Unified School District Board Of Education Regular Meeting
Board meeting · Jan 8, 2025
Budget
The adopted 2026/27 capital-project table lists $1,165,483 under Measure M for Farber Educational Center & Business Center.
Estimated Project Cost of Measure H - 2026/27 Estimated Project Cost of Measure M - 2026/27 Estimated Project Cost of Bond Savings Projects - 2026/27 Elementary Schools $� 10,577,039 � $� 13,082,543 � $� 1,650,000 Classroom Construction/Improvements � � � 1,578,024 � � Cafeteria/Multi-purpose room (MPR) � � � 1,680,127 � � Measure H Planning and Design �…
Fresno Unified School District FY2026-27 Budget
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (22 days left)
Budget · Jul 1, 2026