Closed

Fan Plant Component Repairs

Description: Decommission, remove, and dispose of existing motorized control cabinets (mcc) and associated wiring, cabling, and conduit, and install, test, and commission new mccs, supervisory control cabinets (scc) and associated wiring, cabling, and conduit, work. Install, test, and commission new data cabinets, field distribution panels (fdp), alternative field distribution panels (afdp), and/or network switches;install, test, and commission new fiber optic cabling between scc, new telecommunications equipment and communication rooms; andperform asbestos surveys and abate asbestos containing material (acm) identified by both contractor's surveys and existing surveys.

Buyer
NYC Transit Bid Desk

SpecialDistrict · NY, US

Released
Jun 8, 2026
Closes
Sep 22, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts