Fairhope Cast Iron Replacement Phase 3 RFP
Work inlcudes 480 EA 3/4" pe service replacement; 38,232 LF 2" pe main installation; 506 LF 3/4" pe main installation; 50 EA pe valve installation; 22 EA tie-in to pressurized main, 2"; 1 EA mobilization for construction crews and equipment; 38,232 LF pre-construction video inspection of sewer mains (includes locating and cleaning); 480 EA pre-construction video inspection of sewer laterals (includes locating and cleaning); 38,232 LF post-construction video inspection of sewer mains (includes locating and cleaning); 480 EA post-construction video inspection of sewer laterals (includes locating and cleaning); 1 EA mobilization for sewer cleaning and video inspection. See attached file.