Fairhope Cast Iron Replacement Phase 3 RFP
The City of Fairhope is requesting responses from qualified vendors to construct approximately 38,232' of 2" PE, and 506' of 3/4" PE gas mains. Contractor will install new gas ¾" PE service lines from main to meter to serve approximately 480 existing gas customers and perform tie-ins for the new 2" and ¾" gas mains. Existing gas mains and existing gas service lines will be retired in place. The system will be designed and tested to operate at 60 PSIG. Contractor will also replace approximately 1,200 water meters and connect SmartPoint to each new water meter installation. The replaced water meter will be returned to the City of Fairhope with supporting documentation.