Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design, furnish, install, configure, and commission a complete security camera, access control, networking, and gate automation system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provision of state-of-the-art IP- based replacements for its current indoor and outdoor security camera systems. Scope of Work Existing Infrastructure: Current system comprises Toughdog with onsite NVR. System Requirements: Cameras must utilize IP technology, support PoE, offer cloud or NVR compatibility, and seamlessly integrate with existing infrastructure. Coverage Areas: Indoor hallways, exterior open areas, interior and exterior gymnasiums, and both interior and exterior sections of the football field. Removal: Vendors are responsible for the removal and proper disposal of all legacy equipment. Technical Specifications Camera Types: Including but not limited to bullet, dome, PTZ, fisheye models. Resolution & FPS: Minimum specifications of 1080p/4MP at 15-30 frames per second (as appropriate). Video Retention: Archival period between 30 to 90 days. Software: Must include provisions for both remote and onsite access. Network: Systems must support Power over Ethernet (PoE) and consider network bandwidth requirements. Proposal Submission Requirements. Cover Letter and Executive Summary. Company Overview and Relevant Experience. Detailed Bill of Materials (BOM): Manufacturer, model, and quantity for all hardware components. Cost Breakdown: Separate line items for labor, hardware, software, installation, removal, training, and ongoing support
Posted Date
Dec 10, 2025
Due Date
Feb 27, 2026
Premium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Feb 27, 2026
Provision of state-of-the-art IP- based replacements for its current indoor and outdoor security camera systems. Scope of Work Existing Infrastructure: Current system comprises Toughdog with onsite NVR. System Requirements: Cameras must utilize IP technology, support PoE, offer cloud or NVR compatibility, and seamlessly integrate with existing infrastructure. Coverage Areas: Indoor hallways, exterior open areas, interior and exterior gymnasiums, and both interior and exterior sections of the football field. Removal: Vendors are responsible for the removal and proper disposal of all legacy equipment. Technical Specifications Camera Types: Including but not limited to bullet, dome, PTZ, fisheye models. Resolution & FPS: Minimum specifications of 1080p/4MP at 15-30 frames per second (as appropriate). Video Retention: Archival period between 30 to 90 days. Software: Must include provisions for both remote and onsite access. Network: Systems must support Power over Ethernet (PoE) and consider network bandwidth requirements. Proposal Submission Requirements. Cover Letter and Executive Summary. Company Overview and Relevant Experience. Detailed Bill of Materials (BOM): Manufacturer, model, and quantity for all hardware components. Cost Breakdown: Separate line items for labor, hardware, software, installation, removal, training, and ongoing support
AvailableProject consists water treatment facility upgrade. See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 1, 2026
Release: Dec 3, 2025
Close: Jan 1, 2026
Project consists water treatment facility upgrade. See outside link.
AvailableProvide integrated biorefinery facility north high bay revitalization custom equipment.
Posted Date
Oct 16, 2025
Due Date
Dec 17, 2025
Release: Oct 16, 2025
Close: Dec 17, 2025
Provide integrated biorefinery facility north high bay revitalization custom equipment.
AvailableWork includes network security camera upgrade.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
Work includes network security camera upgrade.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis