Open RFP

F-0039(59)4 - Rehabilitation High Volume RFP

Description: Work includes 1 LS of mobilization; 3 EA of reconstruct catch basin - lower; 3 EA of reconstruct catch basin - raise (rapid strength); 18 EA of reconstruct valve box - lower; 18 EA of reconstruct valve box - raise (rapid strength); 17 EA of reconstruct manhole - lower; 17 EA of reconstruct manhole - raise (rapid strength); 11 SY of remove concrete sidewalk; 641 FT of remove concrete curb; 43 ft of remove concrete curb and gutter; 50 ft of crack sealing; 9 SY of partial depth repair for concrete pavement (rapid strength); 4,693 SY of full depth slab replacement (rapid strength); 1,784 SF of reconstruct pedestrian access ramp remove sidewalk; etc, see attached files.

Buyer
Released
Sep 12, 2026
Closes
Oct 6, 2026(16 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts