Description This project centers on the installation of a fleet vehicle charging station at the Medium Institution. The works include but are not limited to: •Installing new OCP and metering in existing MDP in existing generator building. •Trenching, installing conduit, and cabling between existing pull box (PWR-3B) and proposed EVSE enclosure location. •Installation of EVSE enclosure and transformers complete with structural pads. •Trenching, installing conduit, and cabling between EVSE enclosure and new L2/L3 EV Chargers. •Commissioning and testing of distribution equipment.