Closing soon

Phase 1 EZ899-271002 Fleet Electrical Charging Station Installation RFP

Description: Description This project centers on the installation of a fleet vehicle charging station at the Medium Institution. The works include but are not limited to: •Installing new OCP and metering in existing MDP in existing generator building. •Trenching, installing conduit, and cabling between existing pull box (PWR-3B) and proposed EVSE enclosure location. •Installation of EVSE enclosure and transformers complete with structural pads. •Trenching, installing conduit, and cabling between EVSE enclosure and new L2/L3 EV Chargers. •Commissioning and testing of distribution equipment.

Buyer
Released
Nov 13, 2026
Closes
Nov 30, 2026(13 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts