Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Concrete storm drainage accessories.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 11, 2026
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
AvailableWork includes storm drainage uv lining projects.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Work includes storm drainage uv lining projects.
AvailableThis is an Invitation for Bids for storm drain pipe lining work posted via the Utah Public Procurement Place (U3P) Bonfire portal. The solicitation solicits contractors to provide pipe-lining/rehabilitation services for storm drainage infrastructure and is not a grant. The posting was listed as open with submissions due January 29, 2026, indicating the opportunity is active as of 2026-01-15.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
This is an Invitation for Bids for storm drain pipe lining work posted via the Utah Public Procurement Place (U3P) Bonfire portal. The solicitation solicits contractors to provide pipe-lining/rehabilitation services for storm drainage infrastructure and is not a grant. The posting was listed as open with submissions due January 29, 2026, indicating the opportunity is active as of 2026-01-15.
AvailableRemoval of the existing 6'x 2.5 box culvert and associated Storm pipe and the installation of a double run of 48" concrete RCP Class III pipe with associated head walls as indicated in the construction plans attached herein. The work to be performed under this contract includes, but is not limited to, the following items: Road cut and removal of existing asphalt and 12" concrete road base, Removal of the existing box culvert and storm system and the installation of approximately 64 linear feet of 48-inch Class III RCP storm pipe and installation of Headwalls, Traffic control and maintenance of traffic in accordance with approved traffic control plans, dewatering operations as required to facilitate construction, backfilling, compaction, grading, and restoration of disturbed areas, borrow material placement and grading, as necessary, Storm drainage and structure installation, bypass pumping if necessary to prevent flooding upstream. Erosion and sedimentation control measures, grassing and final site stabilization.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
Removal of the existing 6'x 2.5 box culvert and associated Storm pipe and the installation of a double run of 48" concrete RCP Class III pipe with associated head walls as indicated in the construction plans attached herein. The work to be performed under this contract includes, but is not limited to, the following items: Road cut and removal of existing asphalt and 12" concrete road base, Removal of the existing box culvert and storm system and the installation of approximately 64 linear feet of 48-inch Class III RCP storm pipe and installation of Headwalls, Traffic control and maintenance of traffic in accordance with approved traffic control plans, dewatering operations as required to facilitate construction, backfilling, compaction, grading, and restoration of disturbed areas, borrow material placement and grading, as necessary, Storm drainage and structure installation, bypass pumping if necessary to prevent flooding upstream. Erosion and sedimentation control measures, grassing and final site stabilization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →