Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of the existing 6'x 2.5 box culvert and associated Storm pipe and the installation of a double run of 48" concrete RCP Class III pipe with associated head walls as indicated in the construction plans attached herein. The work to be performed under this contract includes, but is not limited to, the following items: Road cut and removal of existing asphalt and 12" concrete road base, Removal of the existing box culvert and storm system and the installation of approximately 64 linear feet of 48-inch Class III RCP storm pipe and installation of Headwalls, Traffic control and maintenance of traffic in accordance with approved traffic control plans, dewatering operations as required to facilitate construction, backfilling, compaction, grading, and restoration of disturbed areas, borrow material placement and grading, as necessary, Storm drainage and structure installation, bypass pumping if necessary to prevent flooding upstream. Erosion and sedimentation control measures, grassing and final site stabilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailableRemoval and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close:
Project will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Project will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
AvailableThis project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.