Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include demolition and replacement of existing power conductors from the eureka wwtp substation to the influent pump station control building, demolition of a decommissioned grit removal system, furnishing and installation of blowers, aeration piping and diffusers and other associated appurtenances in the equalization tank at the authority's eureka wastewater treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contract include the demolition and removal of two (2) Aeration Blowers, demolition of concrete equipment pads, air piping and pipe supports, the installation of four (4) owner-supplied Aeration Blowers, furnishing and installation of new concrete equipment pads, discharge air piping and other minor modifications in Blower Buildings 1 and 2 at the Authority’s Wastewater Treatment Plant.
Posted Date
Jan 28, 2026
Due Date
Feb 23, 2026
Release: Jan 28, 2026
Close: Feb 23, 2026
Contract include the demolition and removal of two (2) Aeration Blowers, demolition of concrete equipment pads, air piping and pipe supports, the installation of four (4) owner-supplied Aeration Blowers, furnishing and installation of new concrete equipment pads, discharge air piping and other minor modifications in Blower Buildings 1 and 2 at the Authority’s Wastewater Treatment Plant.
AvailableThe City of Roseville Environmental Utilities Department seeks proposals to provide design-assist and construction services to install a foul air collection system for the influent bar-screen, grit building, and primary clarifiers, and to rehabilitate the existing biofilter at the Dry Creek Wastewater Treatment Plant. The procurement is identified as RFP #08-151 with an estimated project value between $5,000,000 and $15,000,000, and the City will select a qualified partner through a competitive negotiation process. Proposals are due March 11, 2026; interested firms must submit proposals per the requirements posted on the City’s procurement portal.
Posted Date
Jan 20, 2026
Due Date
Mar 11, 2026
Release: Jan 20, 2026
Close: Mar 11, 2026
Work includes wastewater treatment plant improvements electrical equipment.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes wastewater treatment plant improvements electrical equipment.
AvailableWork includes construction of the equalization tank system.
Posted Date
-
Due Date
Feb 11, 2026
Release: -
Close: Feb 11, 2026
Work includes construction of the equalization tank system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Roseville Environmental Utilities Department seeks proposals to provide design-assist and construction services to install a foul air collection system for the influent bar-screen, grit building, and primary clarifiers, and to rehabilitate the existing biofilter at the Dry Creek Wastewater Treatment Plant. The procurement is identified as RFP #08-151 with an estimated project value between $5,000,000 and $15,000,000, and the City will select a qualified partner through a competitive negotiation process. Proposals are due March 11, 2026; interested firms must submit proposals per the requirements posted on the City’s procurement portal.