PFAS Water Treatment Project Well Nos. 1,3,5,7,9,14,15,37,43/44 & 45
Posted
-
Oct 27, 2026
Construction and installation of new Ion Exchange (IX) resin filtration systems at each of the ten (10) well sites: Well Site Nos. 1, 3, 5,7, 9, 14, 15, 37, 43/44 and 45. General Construction of Treatment Buildings, Building Additions, Chlorination Equipment and Instrumentation, Demolition of Existing Facility Infrastructure, Various Site Improvements including Upgrade of Existing Driveway, Stormwater Management, Erosion and Sedimentation Controls and Site Restoration, including Grading, Seeding, Concrete Work, Curbing and Paving. Electrical Construction includes upgrades to existing electrical service supply and installation of circuit breakers, transfer switches, transformers, motor starters, conduit and wiring, lighting, instrumentation and associated work. Modifications to SCADA panels and terminations within the SCADA panels will be provided by the Authority’s Systems Integrator under separate contract. Mechanical Construction (HVAC) includes supply and installation of ceiling fans, louvers, heaters, dehumidifiers, ductwork and accessories. Plumbing Construction includes supply and installation of all water, sanitary sewer, storm sewer, floor drains, underground and aboveground piping, and all associated appurtenances inside or outside of buildings.