Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of the equalization tank system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project will include the following services and work: construction of a new 1. 2-million-gallon equalization storage tank, including mixing equipment, controls, and cover. Modification to the existing influent discharge header to include modulating flow controls valves, flow meters, piping, control structures, and controls to split screened, pumped influent between fine screening and the equalization storage tank. Modifications to the existing 36-inch influent gravity sewer to construct new flow control structures, slide gates and frames, piping, and accessories to divert gravity influent flow prior to the influent waste complex wetwell to the equalization storage tank. Construction of new modulating flow controls valve, flow meter, piping, control structures, and controls to control and meter flow from the equalization tank to the Influent Waste Complex wetwell. Complex wetwell. Modifications to the existing influent complex for piping, excavation, penetrations, utilities, and restoration required to perform the work as noted above. Temporary piping, pumping, controls, and monitoring required to perform the work as noted above. Removal of and installation of new site fencing and gates. Plant water and potable water piping and hydrants. Site improvements includina aradina. sidewalk. and liahtina.
Posted Date
Dec 8, 2025
Due Date
Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 8, 2025
Close: Jan 21, 2026
The project will include the following services and work: construction of a new 1. 2-million-gallon equalization storage tank, including mixing equipment, controls, and cover. Modification to the existing influent discharge header to include modulating flow controls valves, flow meters, piping, control structures, and controls to split screened, pumped influent between fine screening and the equalization storage tank. Modifications to the existing 36-inch influent gravity sewer to construct new flow control structures, slide gates and frames, piping, and accessories to divert gravity influent flow prior to the influent waste complex wetwell to the equalization storage tank. Construction of new modulating flow controls valve, flow meter, piping, control structures, and controls to control and meter flow from the equalization tank to the Influent Waste Complex wetwell. Complex wetwell. Modifications to the existing influent complex for piping, excavation, penetrations, utilities, and restoration required to perform the work as noted above. Temporary piping, pumping, controls, and monitoring required to perform the work as noted above. Removal of and installation of new site fencing and gates. Plant water and potable water piping and hydrants. Site improvements includina aradina. sidewalk. and liahtina.
Procurement for the furnishing and installation of a snow plow, frame, hydraulic system, dump body, wing, spreader, and pre-wet tank system on a 2027 Kenworth T480 truck.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Procurement for the furnishing and installation of a snow plow, frame, hydraulic system, dump body, wing, spreader, and pre-wet tank system on a 2027 Kenworth T480 truck.
AvailableWork consists of construction of a fire protection water system water storage tank improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work consists of construction of a fire protection water system water storage tank improvements.
The project generally consists of the construction of a 10,000,000-gallon wire-wound prestressed elevated concrete storage tank.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
The project generally consists of the construction of a 10,000,000-gallon wire-wound prestressed elevated concrete storage tank.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →