Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of Gurnee, Illinois is soliciting sealed bids for the Estes Region Water Main Improvements, including installation of approximately 6,720 feet of 6‑inch and 2,770 feet of 8‑inch PVC water main, valves, hydrants, service connections, and related storm sewer and restoration work. Bids will be accepted only from contractors pre‑qualified by the Owner and meeting IDOT drainage pre‑qualification; bid documents will be distributed via the Village’s LiquidFiles FTP upon pre‑qualification. Sealed bids are due by 10:30 AM on February 9, 2026, at the Village’s Engineering office.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Nov 10, 2025
Close: Jan 13, 2026
Water main improvements.
AvailableWork includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 9, 2026
Release: Dec 22, 2025
Close: Feb 9, 2026
Work includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
AvailableThe City of Taneytown seeks proposals for construction of the Memorial Drive Water Main Improvements, including replacement of 21 water services, replacement of 3 hydrants, installation of a new 6" water main, valves, connections, curb-to-curb pavement mill and overlay, and erosion & sediment control. A mandatory pre-bid conference and site visit is scheduled for 2026-01-07 at 10:00 AM. The solicitation is a Request for Proposal for construction work, open 2025-12-22 through 2026-01-23 and is not a grant program.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
The City of Taneytown seeks proposals for construction of the Memorial Drive Water Main Improvements, including replacement of 21 water services, replacement of 3 hydrants, installation of a new 6" water main, valves, connections, curb-to-curb pavement mill and overlay, and erosion & sediment control. A mandatory pre-bid conference and site visit is scheduled for 2026-01-07 at 10:00 AM. The solicitation is a Request for Proposal for construction work, open 2025-12-22 through 2026-01-23 and is not a grant program.
The East Field Water Main Improvements project replaces piping between the US Coast Guard and Superbay, removes most potable and fire water mains from the East Field, and installs new laterals to each building from North Access Road. The contract requires a California Class A license, a Local Business Enterprise (LBE) subcontracting requirement of 11%, and an estimated construction cost of $14,900,000$17,200,000. Bids are sealed, must be submitted through the Airport e-Procurement portal, and the contract time is 320 consecutive calendar days after Notice to Proceed.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
The East Field Water Main Improvements project replaces piping between the US Coast Guard and Superbay, removes most potable and fire water mains from the East Field, and installs new laterals to each building from North Access Road. The contract requires a California Class A license, a Local Business Enterprise (LBE) subcontracting requirement of 11%, and an estimated construction cost of $14,900,000$17,200,000. Bids are sealed, must be submitted through the Airport e-Procurement portal, and the contract time is 320 consecutive calendar days after Notice to Proceed.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis