Woodhaven Association - WWTP Equalization Basin Improvements
Removal of sludge, liner, baffle wall, etc. In the existing WWTP equalization basin and replacement of the liner, baffle wall and aeration system.
Description: Removal and replacement of five (5) existing aluminum slide gates at Aeration Tank T-14 — two 30" x 30" upward-opening and three 72" x 36" downward-opening weir gates. removal and replacement of up to seven (7) additional slide gates of the same two types at Aeration Tanks T-11, T-12 and T-13. Minor concrete and metal fabrication as necessary for fully functional gates. Associated minor work to maintain operation of the equalization basins.
SpecialDistrict · PA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Sunbury City Municipal (Water Sewer Solid Waste) Authority.
Adjacent opportunities open for bidding right now.
Posted
Sep 16, 2026
Oct 7, 2026
Removal of sludge, liner, baffle wall, etc. In the existing WWTP equalization basin and replacement of the liner, baffle wall and aeration system.
CountyNJ
Posted
Aug 24, 2026
Oct 7, 2026
Miscellaneous replacement of flap gates and outlet gates.
Regulatory Commission of Alaska
State AgencyAK
Posted
Sep 14, 2026
Oct 12, 2026
The Regulatory Commission of Alaska is seeking a contractor to develop standardized, configurable utility data models for reviewing and calculating Power Cost Equalization levels across rural electric utilities. The work is expected to improve the Commission’s review process, data reliability, and internal controls, with total spending not expected to exceed $100,000. This open Request for Information requires written responses by October 12, 2026, at 5:00 p.m. AKDT, and the work is scheduled for completion by August 27, 2027.
Regulatory Commission of Alaska
State AgencyAK
Posted
Sep 14, 2026
Oct 12, 2026
The Regulatory Commission of Alaska seeks a contractor to develop standardized, configurable utility data models for reviewing and calculating Power Cost Equalization (PCE) levels across regulated and non-regulated rural electric utilities. The work includes sustainable procedures and secure access systems for annual non-fuel and periodic fuel-cost calculations, with a stated minimum of one year of public-utility financial-modeling experience. This open RFI is for contractor services rather than a grant program, and written responses are due October 12, 2026, at 5:00 p.m. AKDT.