FederalCA
Aug 18, 2026
Closes
Sep 2, 2026
EO 14398 - This Requirement Is for Support Service RFP
The project scope includes the installation of equipment vaults, DC power system (including solar array), grounding system, telemetry infrastructure, and drainage system that comprises a seismic station. Skills necessary include demolition, excavation, concrete, electrical (specifically DC and solar), general construction, and landscaping/site restoration.