FederalCA
Aug 18, 2026
Closes
Sep 2, 2026
EO 14398 - This Requirement Is for Support Service
The project scope includes the installation of equipment vaults, DC power system (including solar array), grounding system, telemetry infrastructure, and drainage system that comprises a seismic station. Skills necessary include demolition, excavation, concrete, electrical (specifically DC and solar), general construction, and landscaping/site restoration.