CountyMI
Posted
Sep 5, 2026
Sep 23, 2026
Chiller Removal and Replacement RFP
Removal and replacement of the HVAC Chiller System, twenty (20) fan coil units, and one (1) air handler.
Description: Railroad track construction contractors for the removal and replacement of three Enginehouse turnouts at Morristown Yard, including turnout removal and disposal, roadbed reconstruction, and furnishing and installation of new turnouts.
PoliceDepartment · NJ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyMI
Posted
Sep 5, 2026
Sep 23, 2026
Removal and replacement of the HVAC Chiller System, twenty (20) fan coil units, and one (1) air handler.
Hertford County Public Schools
School DistrictNC
Posted
Aug 25, 2026
Sep 28, 2026
The Hertford County Board of Education is soliciting design-build firms through an open request for quotes to remove and replace two exterior stairs at Hertford County High School in Ahoskie, North Carolina. The work includes demolition of the existing stairs and construction of new two-story steel and concrete stairs with railings and guardrails, with all work complying with North Carolina Department of Public Instruction requirements. The official eVP record identifies this as an open procurement solicitation rather than a grant; it was posted on August 25, 2026, and its opening/response deadline is September 28, 2026 at 3:00 p.m.
CountyIN
Posted
Aug 8, 2026
Sep 17, 2026
Develop, design, removal, install and construct of a chiller replacement.
U.S. Army Engineer District ST Paul
FederalMN
Posted
Aug 31, 2026
Oct 1, 2026
The U.S. Army Corps of Engineers St. Paul District is soliciting a total-small-business-set-aside contract for removal and replacement of the welding shop dust collector system. The work will be performed at the Fountain City Service Base in Fountain City, Wisconsin, with an expected performance period of no more than 100 calendar days from the Notice to Proceed. Offers are due October 1, 2026, at 3:00 p.m. CDT, and the solicitation is an active procurement rather than a grant program.