Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide a comprehensive study of the existing heating, ventilation, and air conditioning (HVAC) systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 8, 2025
Close: Mar 3, 2026
Design-Build hvac system upgrades.
AvailableHeadquarters office building HVAC system upgrades.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Headquarters office building HVAC system upgrades.
AvailableAudio & Lighting System Upgrades.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Audio & Lighting System Upgrades.
AvailableProvide construction services for HVAC upgrades: upgrade and improve the building infrastructure HVAC systems by reutilizing existing roof top units (RTU) and replacing other RTU with new systems and ductwork; remove existing roofing and replace with new insulation and 4-ply built-up roof system. Provide structural enhancements for HVAC RTU support. Replace all roof drains and splash pads, parapet walls, and roof access stairway; update and improve associated, general building electrical systems and services including replacing the existing electrical room door and adding an additional egress door from the electrical room. Lighting and ceiling fan replacements in poultry holding rooms where hvac system replacements are occurring only all other rooms will retain existing lighting and fans. See outside link.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Provide construction services for HVAC upgrades: upgrade and improve the building infrastructure HVAC systems by reutilizing existing roof top units (RTU) and replacing other RTU with new systems and ductwork; remove existing roofing and replace with new insulation and 4-ply built-up roof system. Provide structural enhancements for HVAC RTU support. Replace all roof drains and splash pads, parapet walls, and roof access stairway; update and improve associated, general building electrical systems and services including replacing the existing electrical room door and adding an additional egress door from the electrical room. Lighting and ceiling fan replacements in poultry holding rooms where hvac system replacements are occurring only all other rooms will retain existing lighting and fans. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis