Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Headquarters office building HVAC system upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project focuses on the replacement of the existing boiler and chiller system with a water to air heat pump system. In the completion of this work, the replacement of piping, pumps, and floor transfer boxes will also require evaluation and replacement. In addition, this project will also replace the domestic hot water heating system of the building.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
The project focuses on the replacement of the existing boiler and chiller system with a water to air heat pump system. In the completion of this work, the replacement of piping, pumps, and floor transfer boxes will also require evaluation and replacement. In addition, this project will also replace the domestic hot water heating system of the building.
Premium
Access the largest public sector contact database
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Posted Date
Dec 1, 2025
Due Date
Jan 16, 2026
Release: Dec 1, 2025
Close: Jan 16, 2026
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
AvailableThis project entails replacement of two (2) 1000 mbh boilers and flue, hydronic pumps, replacement of water source heat pump and expansion of the existing geothermal well field. A building automation control system facility upgrade by johnson controls is included via allowance.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
This project entails replacement of two (2) 1000 mbh boilers and flue, hydronic pumps, replacement of water source heat pump and expansion of the existing geothermal well field. A building automation control system facility upgrade by johnson controls is included via allowance.
AvailableThe Commonwealth of Kentucky, Department of Criminal Justice Training (DOCJT) is soliciting bids to upgrade the HVAC systems at the Weber Building in Richmond, KY, including replacement of two 1000 MBH boilers and flue, hydronic pumps, a water source heat pump, and expansion of the existing geothermal well field. The project also includes a facility building automation control system upgrade by Johnson Controls and work will be performed at the Weber Building (4449 Kit Carson Drive, Richmond, KY). Bidders must be registered in the Commonwealth eProcurement (VSS) system and submit electronic bids through that system by the solicitation closing date.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The Commonwealth of Kentucky, Department of Criminal Justice Training (DOCJT) is soliciting bids to upgrade the HVAC systems at the Weber Building in Richmond, KY, including replacement of two 1000 MBH boilers and flue, hydronic pumps, a water source heat pump, and expansion of the existing geothermal well field. The project also includes a facility building automation control system upgrade by Johnson Controls and work will be performed at the Weber Building (4449 Kit Carson Drive, Richmond, KY). Bidders must be registered in the Commonwealth eProcurement (VSS) system and submit electronic bids through that system by the solicitation closing date.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis