CityIL
Posted
Nov 6, 2026
Dec 1, 2026
95th Street Sanitary Lift Station Improvements RFP
95th Street sanitary lift station improvements.
Description: The existing Gault Road Sanitary Lift Station is located at 300 Gault Road. The station is a duplex style (tender drawings for electrical upgrades done at this station in 2008 are included in Appendix C. It should be noted that these are not record drawings and it is uncertain if additional work (electrical or any other type) was done on the station since this time). The current station is at the end of its life for providing reliable wastewater collection and upgrades are required. The Consultant shall complete preliminary design, detailed design and provide detailed cost estimates for construction, as well as provide construction management and inspection services for the Gault Road Sanitary Lift Station Renewal.
City · NB, CA
Adjacent opportunities open for bidding right now.
CityIL
Posted
Nov 6, 2026
Dec 1, 2026
95th Street sanitary lift station improvements.
CityID
Posted
Nov 25, 2026
Dec 15, 2026
The City of Post Falls is soliciting prequalification applications from general contractors for the Guy Road -- Fisher Lift Station project. The prequalification evaluates prime contractors only under Idaho Code §67-2805(2)(b), Category B, to determine which firms will be eligible to bid if the City proceeds with construction bidding. Applicants meeting the published requirements will be eligible to bid; prequalification materials and an optional prequalification meeting and question process are provided by the City.
CityIN
Posted
-
Dec 8, 2026
Construction services to install new sewage pumps and associated electrical equipment at the Sage Road Lift Station in South Bend, Indiana, per the project's plans and specifications. Work will be performed in accordance with Contract Documents prepared by DLZ Indiana, LLC, with documents available for purchase/inspection from the listed reprographic and inspection locations. Bidders must meet City of South Bend EEO and diversity utilization requirements, provide bid security, and comply with the Responsible Bidder Ordinance provisions.
CityLA
Posted
-
Dec 15, 2026
Upgrade of the existing sewer lift stations. These upgrades include demolition of both wet well tops on the existing lift stations, removal of pumps, controls, and discharge piping, and the construction of new wet well rcp extensions, reinforced concrete tops, valve boxes, discharge piping, pumps, control panels, radio communication, new electrical service, sewer manhole rehab, and site improvements as appropriate for complete and operational systems.
Decision makers connected to this RFP from Saint John.
Solicitation files and supporting documents for this bid.