CityMA
Jul 20, 2026
Closes
Aug 12, 2026
ADA Ramps and Concrete Sidewalks, 2026
ADA ramps and concrete sidewalks. Scope of work includes - 5 CY unclassified excavation; 1 EA sidewalk gate box adjusted; 6 SY hot mix asphalt for permanent patch (5"); 73 LF curb removed and reset; 7 EA silt sack; 10 SY cement conc. sidewalk; see attached file.