Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide engineering and environmental services for Craney island landfill.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Burlington is soliciting environmental consulting services for a scoping study and site investigation at the closed Manhattan Landfill (Burlington Municipal Disposal Grounds). The project is divided into two phases: Phase I involves inspections and condition assessments of the landfill cap, methane collection system, and leachate systems. Phase II includes environmental assessments, groundwater and leachate sampling, and reporting that complies with Vermont standards. The contract is intended to support redevelopment planning, provide remediation recommendations, and identify potential funding opportunities, with an estimated value range of $500,000 to $2,000,000.
Posted Date
Dec 15, 2025
Due Date
Feb 25, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 25, 2026
The City of Burlington is soliciting environmental consulting services for a scoping study and site investigation at the closed Manhattan Landfill (Burlington Municipal Disposal Grounds). The project is divided into two phases: Phase I involves inspections and condition assessments of the landfill cap, methane collection system, and leachate systems. Phase II includes environmental assessments, groundwater and leachate sampling, and reporting that complies with Vermont standards. The contract is intended to support redevelopment planning, provide remediation recommendations, and identify potential funding opportunities, with an estimated value range of $500,000 to $2,000,000.
AvailableSt. Johns County School District is soliciting proposals for professional engineering, surveying, and environmental continuing contract services to be awarded to multiple vendors on an as-needed basis. The solicitation (RFQ2026-007) requires electronic submission and includes scope areas such as engineering services, GIS/mapping, environmental services, and land surveying. The opportunity opened on 2026-01-05 and is scheduled to close on 2026-02-09, and it is active (not a grant) as of 2026-01-07.
Posted Date
Jan 5, 2026
Due Date
Feb 9, 2026
Release: Jan 5, 2026
Close: Feb 9, 2026
St. Johns County School District is soliciting proposals for professional engineering, surveying, and environmental continuing contract services to be awarded to multiple vendors on an as-needed basis. The solicitation (RFQ2026-007) requires electronic submission and includes scope areas such as engineering services, GIS/mapping, environmental services, and land surveying. The opportunity opened on 2026-01-05 and is scheduled to close on 2026-02-09, and it is active (not a grant) as of 2026-01-07.
AvailableWork includes to develop one or more landfill gas to energy (lfgte) or other beneficial use project(s) utilizing landfill gas (lfg).
Posted Date
Nov 24, 2025
Due Date
Feb 25, 2026
Release: Nov 24, 2025
Close: Feb 25, 2026
Work includes to develop one or more landfill gas to energy (lfgte) or other beneficial use project(s) utilizing landfill gas (lfg).
AvailableProvide airport engineering, planning, construction management, and environmental services. The anticipated projects over the term of the agreement may include, but are not limited to: rehabilitate, crack seal and re-mark airfield runway and ramp pavements; apron construction; terminal building and aircraft hangar construction; perimeter fencing.
Posted Date
Jan 26, 2026
Due Date
Feb 9, 2026
Release: Jan 26, 2026
Close: Feb 9, 2026
Provide airport engineering, planning, construction management, and environmental services. The anticipated projects over the term of the agreement may include, but are not limited to: rehabilitate, crack seal and re-mark airfield runway and ramp pavements; apron construction; terminal building and aircraft hangar construction; perimeter fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →