CityOH
Aug 3, 2026
Closes
Aug 17, 2026
2026 Street Improvement Project RFP
Work associated with the base bid consists of pavement planing, application of tack coat, partial-depth pavement repairs, and placement of an asphalt surface course.
Description: The project involves constructing approx 6,860 SY of 2" of HMAC, 8,356 SY of 8" of ReClaim Asphalt and Caliche Base, and 4,286 LF of 18 inches Curb & Gutter.
County · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityOH
Aug 3, 2026
Closes
Aug 17, 2026
Work associated with the base bid consists of pavement planing, application of tack coat, partial-depth pavement repairs, and placement of an asphalt surface course.
CityMD
Aug 6, 2026
Closes
Sep 4, 2026
Perform asphalt work within the corporate limits of the town. This will include approx 13,000 SY of asphalt milling and overlay on town streets consisting of the following: mill out existing asphalt to 2" depth; clean and tack coat existing asphalt; install 2" of hot mix surface asphalt (type 9. 5mm 64-22); re-install any speedbumps milled away; complete striping of pavement.
CityFL
Aug 7, 2026
Closes
Sep 18, 2026
The City of Temple Terrace is soliciting construction bids for the CDBG 54th Street Water Main Improvement Project. The work includes approximately 800 feet of 6-inch fusible PVC water main on 54th and 55th Streets, related valves, hydrant facilities, testing, and new residential water services. The posting is an open construction procurement, with bids due September 17, 2026, at 11:59 PM.
CityCT
Jul 2, 2026
Closes
Aug 11, 2026
The Town of East Hartford, CT is soliciting bids for the Burnham Street/Sherwood Drive Road Improvement Project (Bid No. 27-02), a road reconstruction project with full-depth pavement work and drainage improvements along Burnham Street from Long Hill Street to the Manchester town line and pavement rehabilitation of Sherwood Drive. Proposals will be received at the Office of the Purchasing Agent, Town Hall, 740 Main Street, East Hartford, CT 06108, until 11:00 AM on Tuesday, August 11, 2026, when they will be publicly opened and recorded. A performance bond will be required from the awarded bidder, and the Town reserves the right to reject any or all bids.
Procurement and program contacts connected to Starr County.