Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of Glenview is soliciting bids for Elm Street roadway and utility improvements. Work includes HMA pavement reconstruction and replacement, approximately 2,518 LF of water main, about 320 LF of storm sewer, sanitary sewer improvements, and curb and gutter construction/replacement. Plans and specifications are provided through the Village’s DemandStar portal, with bids due February 5, 2026 at 1:00 PM Central.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requests proposals from qualified professional engineering consultants for the purpose of Construction Engineering Services (“Services”) for the Village’s 2026 Utility and Roadway Improvements Project. Work consists of onsists of roadway reconstruction, milling and resurfacing, various removals; storm sewer and drainage structures; water distribution system improvements; sanitary sewer collection and conveyance system repairs; hot mix asphalt and concrete driveways; hot mix asphalt pavement; sodding; and all incidental and collateral work necessary to complete the improvements.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Requests proposals from qualified professional engineering consultants for the purpose of Construction Engineering Services (“Services”) for the Village’s 2026 Utility and Roadway Improvements Project. Work consists of onsists of roadway reconstruction, milling and resurfacing, various removals; storm sewer and drainage structures; water distribution system improvements; sanitary sewer collection and conveyance system repairs; hot mix asphalt and concrete driveways; hot mix asphalt pavement; sodding; and all incidental and collateral work necessary to complete the improvements.
AvailableThe work for which proposals are invited consists of tree protection, various removals, pavement patching, storm sewer and drainage structures; structure adjustments, sanitary sewer point repairs, watermain, concrete curb and gutter, sidewalk, hot mix asphalt and concrete driveways; hot mix asphalt pavement; aggregate shoulders, sodding; pavement marking and all incidental and collateral work necessary to complete the improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
The work for which proposals are invited consists of tree protection, various removals, pavement patching, storm sewer and drainage structures; structure adjustments, sanitary sewer point repairs, watermain, concrete curb and gutter, sidewalk, hot mix asphalt and concrete driveways; hot mix asphalt pavement; aggregate shoulders, sodding; pavement marking and all incidental and collateral work necessary to complete the improvements.
The City of Allegan is soliciting construction bids to reconstruct streets and replace utilities (water main, sanitary sewer, and storm sewer) within its downtown on Trowbridge, Walnut, and Chestnut Streets, with an alternate for Grand Street watermain. Work includes roadway reconstruction, curb and gutter, sidewalk, streetscape features, and associated appurtenances. Bids are administered via the City’s engineer (Abonmarche) bid room, with bid opening scheduled for January 26, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
The City of Allegan is soliciting construction bids to reconstruct streets and replace utilities (water main, sanitary sewer, and storm sewer) within its downtown on Trowbridge, Walnut, and Chestnut Streets, with an alternate for Grand Street watermain. Work includes roadway reconstruction, curb and gutter, sidewalk, streetscape features, and associated appurtenances. Bids are administered via the City’s engineer (Abonmarche) bid room, with bid opening scheduled for January 26, 2026.
Approx. 2,850 LF of roadway reconstruction including water utility replacement. Water utility replacement includes proposed 8" ductile iron main with all associated fittings, appurtenances, and services. Roadway reconstruction includes spot concrete curb and gutter replacement, dense graded base aggregate, and 4" asphaltic pavement. Approx. 2,275 LF of partial roadway reconstruction with storm sewer crossing replacements. Storm sewer crossing replacements include proposed RCP storm sewer and all associated structures and connections. Partial roadway reconstruction includes spot concrete curb and gutter replacement, spot base repairs, grading, and 4" asphaltic pavement. All other associated removals, erosion control, traffic control, clearing and grubbing, excavation, grading, and pavement markings.
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Close: Feb 12, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Approx. 2,850 LF of roadway reconstruction including water utility replacement. Water utility replacement includes proposed 8" ductile iron main with all associated fittings, appurtenances, and services. Roadway reconstruction includes spot concrete curb and gutter replacement, dense graded base aggregate, and 4" asphaltic pavement. Approx. 2,275 LF of partial roadway reconstruction with storm sewer crossing replacements. Storm sewer crossing replacements include proposed RCP storm sewer and all associated structures and connections. Partial roadway reconstruction includes spot concrete curb and gutter replacement, spot base repairs, grading, and 4" asphaltic pavement. All other associated removals, erosion control, traffic control, clearing and grubbing, excavation, grading, and pavement markings.