Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of electrical infrastructure replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide mechanical/electrical contractors for a HVAC system replacement.
Posted Date
Dec 19, 2025
Due Date
Jan 8, 2026
Release: Dec 19, 2025
Close: Jan 8, 2026
Provide mechanical/electrical contractors for a HVAC system replacement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes replacement of uninterruptible power supplies, panelboards, transformers, surge protection devices, and lighting fixtures for the affected locations described in the drawings. Electronic safety and security scope includes fire alarm work for preaction sprinkler system monitoring and installation of SAACS door security for electrical room doors. Mechanical work includes the addition of a preaction sprinkler system. Controls work includes electrical equipment monitoring. Telecommunications work include backbone fiber cabling and horizontal category cabling installation to support mechanical and electrical network connected equipment. Work also includes CIP concrete, doors and hardware for card reader systems, and painting.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
Project includes replacement of uninterruptible power supplies, panelboards, transformers, surge protection devices, and lighting fixtures for the affected locations described in the drawings. Electronic safety and security scope includes fire alarm work for preaction sprinkler system monitoring and installation of SAACS door security for electrical room doors. Mechanical work includes the addition of a preaction sprinkler system. Controls work includes electrical equipment monitoring. Telecommunications work include backbone fiber cabling and horizontal category cabling installation to support mechanical and electrical network connected equipment. Work also includes CIP concrete, doors and hardware for card reader systems, and painting.
AvailableReplace the existing VM Infrastructure. The existing environment is a 5-node server cluster running a vmware hypervisor. Attached is a general overview of a 7-day LiveOptics capture of our existing environment.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
Replace the existing VM Infrastructure. The existing environment is a 5-node server cluster running a vmware hypervisor. Attached is a general overview of a 7-day LiveOptics capture of our existing environment.
Qualified suppliers with a proven and documented track record of providing Supervisory Control and Data Acquisition (SCADA) Low Pressure Sanitary System (LPSS) infrastructural system electrical parts.
Posted Date
Dec 17, 2025
Due Date
Jan 19, 2026
Release: Dec 17, 2025
Close: Jan 19, 2026
Qualified suppliers with a proven and documented track record of providing Supervisory Control and Data Acquisition (SCADA) Low Pressure Sanitary System (LPSS) infrastructural system electrical parts.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →