Posted
May 19, 2026
Nov 13, 2026
Repair Water Penetration NCO 4 Construction East (VA-26-00020634) (VA-26-00020634) - Request for information (RFI)
Correct FCA deficiencies A repair water penetration.
Description: The project consists of: Review and validation of inspection results; Procurement and installation of circuit breakers and racking mechanisms ; Repair old racking mechanisms and provide VAMC as future spares ; Repair old circuit breakers and provide VAMC as future spares; Evaluation of failed circuit breakers; Repair of all deficiencies listed on Low Voltage Power Circuit Breaker Test and Inspection Deficiency Summary.
Federal · VA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Posted
May 19, 2026
Nov 13, 2026
Correct FCA deficiencies A repair water penetration.
Posted
May 18, 2026
Oct 29, 2026
The contractor shall provide all tools, travel, trades, labor, materials, permits, licenses and supervision for construction of the Tuckpointing project.
Posted
Aug 25, 2026
Nov 9, 2026
The anticipated system shall include, but not be limited to: Removal and proper disposal of the existing patient elopement prevention system and associated hardware in accordance with VA environmental and information security policies. Installation and deployment of the new patient elopement prevention system. Wearable tags or wristbands for at-risk patients. Fixed and/or portable monitoring devices covering all potential exit points. Integration with existing VA IT and security infrastructure. Real-time notification to nursing stations and mobile devices. Secure logging and reporting features. See attached file.
School DistrictNE
Posted
Jul 22, 2026
Nov 10, 2026
Construction of two (2), two-story wood frame barracks facilities (6,982 SF and 6,615 SF) 49 Bed Collective Training (CT) Unaccompanied Housing (UH), Senior NCO and Officer Quarters, supporting transient unit billeting requirements. Construction will consist of site work and grading, utilities, installation of 2 buildings (Buildings #635 and #640), fire detection and alarm systems, capital improvements of sidewalks, exterior lighting and landscaping storm drainage.