Posted
Aug 31, 2026
Sep 30, 2026
Z2DA--FY26 NRM | 460-26-008 | CLC Roof HVAC Piping Replacement RFP
Replace in kind the Heating Hot Water and Chilled Water piping and all associated main and branch piping, on the roof of Community Living Center. Including over 300 F of 3 inch carbon steel piping for Chilled Water system, And 300 F of 2.5" Type “K” copper for the Heating Hot Water. Replace electric heat trace on both systems. Replace insulation on both systems. Insulation shall consist of appropriately sized insulation with a secondary vapor barrier for all pipe diameters per 23 07 11 Section 2.5 Pipe Insulation Schedule. See attached file.