California Department of General Services
State AgencyCA
Posted
Oct 19, 2026
Nov 30, 2026
FTB - Electric Vehicle Supply Equipment Franchise Tax Board RFP
Install and electrically connect EVSE infrastructure to include wiring devices, and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Bollards may be required on this contract even if not shown explicitly on the construction drawings. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain.
