Brockton Regional Transit Authority
Special DistrictMA
Posted
Oct 29, 2026
Nov 18, 2026
Electric Vehicle Supply Equipment RFP
Provide and install DC Fast Charging equipment to conduct overnight depot charging for heavy duty battery electric buses.
Description: Install and electrically connect EVSE infrastructure to include wiring devices, and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Bollards may be required on this contract even if not shown explicitly on the construction drawings. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain.
StateAgency · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from California Department of General Services.
Adjacent opportunities open for bidding right now.
Brockton Regional Transit Authority
Special DistrictMA
Posted
Oct 29, 2026
Nov 18, 2026
Provide and install DC Fast Charging equipment to conduct overnight depot charging for heavy duty battery electric buses.
California Franchise Tax Board
State AgencyCA
Posted
Oct 12, 2026
Jan 1, 2027
The California Franchise Tax Board seeks qualified vendors to provide creative design and digital advertising services for its California Earned Income Tax Credit (CalEITC) Advertising Campaign. This is a secondary request for proposals for advertising and media-placement services, not a grant program. The posting directs proposers to the RFP attachment for the proposal deadline, states that the event end date is not that deadline, and notes that Addendum 1 materials were posted on October 12, 2026.
CountyNY
Posted
Sep 21, 2026
Nov 6, 2026
Provide a detailed comprehensive report for the potential installation of the electric vehicle (ev) charging infrastructure study. The report shall be an all-inclusive comprehensive assessment of the county s vehicle fleet, potential installation for ev charging infrastructure, existing buildings electrical systems for additional load capacity, cost analysis detailing costs for potential installation of ev charging infrastructure, transitioning vehicle fleet from gasoline to electric propulsion and other associated equipment and improvements needed to support the ev charging infrastructure.
CityKY
Posted
Nov 8, 2025
Dec 2, 2026
To operate telecommunications systems within the confines of the city.