CityMA
Jul 31, 2026
Closes
Aug 13, 2026
Eastham Phase 1 Collection System - Contract 2 RFP
Sewer piping project.
Description: Installation of approx., 9,100 LF of 8" PVC gravity sewer piping, manholes, and services; 3,800 LF of 4" PVC pressurized sewer force main piping, valves, air release manholes, and blow-off/cleanout manholes; and 6,700 LF of 2" and 1.5" PVC low-pressure sewer main piping, etc.
City · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Town of Eastham.
Adjacent opportunities open for bidding right now.
CityMA
Jul 31, 2026
Closes
Aug 13, 2026
Sewer piping project.
CityMA
Jul 29, 2026
Closes
Aug 19, 2026
Work consists of the installation of four new wastewater pump stations and associated appurtenances, consisting of civil/site work including site preparation, utilities, crushed stone access roads/areas, fences, retaining walls, and restoration; process mechanical work including submersible pumps, valves, and piping; architectural/structural work including concrete and installation of prefabricated pump station sheds; electrical work including coordination with the utility company, lighting, panels, wiring, conduit, and standby generator; plumbing and HVAC work; and instrumentation and controls work.
Indigenous GovernmentID
Jul 30, 2026
Closes
Aug 31, 2026
Perform sewer lateral connections and manhole repairs. Review lateral launch videos and assess needed repairs, chemically grout and seal laterals with PVC compatible materials, review manhole inspection reports, conduct manhole inspections and identify needed repairs, provide a manhole inspection report with proposed solutions for repair or replacement, clean, grout, and repair manholes. A bid item is included for excavation, trenching, backfill, and compaction to provide for any needed repairs requiring excavation.
CityFL
Jul 6, 2026
Closes
Aug 5, 2026
Work includes approx 9,900 LF of 8" SDR PVC gravity sewers; 85 LF of jack and bore (20" casing with 8" carrier); 1,540 LF of directional bore force main; 14,050 LF of 8" video sewer.