CityMA
Jul 31, 2026
Closes
Aug 13, 2026
Eastham Phase 1 Collection System - Contract 2 RFP
Sewer piping project.
Description: Perform sewer lateral connections and manhole repairs. Review lateral launch videos and assess needed repairs, chemically grout and seal laterals with PVC compatible materials, review manhole inspection reports, conduct manhole inspections and identify needed repairs, provide a manhole inspection report with proposed solutions for repair or replacement, clean, grout, and repair manholes. A bid item is included for excavation, trenching, backfill, and compaction to provide for any needed repairs requiring excavation.
IndigenousGovernment · ID, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Coeur D'Alene Tribe.
Adjacent opportunities open for bidding right now.
CityMA
Jul 31, 2026
Closes
Aug 13, 2026
Sewer piping project.
CityCA
Jun 29, 2026
Closes
Aug 6, 2026
Work consists of replacement of up to approx 10,500 LF of 8" to 24" collection pipeline, replacement of laterals and installation of new two-way cleanouts within the right-of-way, replacement of manholes, and lining approx 320 LF of existing 15" collection pipeline.
CityNJ
Jul 29, 2026
Closes
Aug 13, 2026
Operation and maintenance of the wastewater collection system of the township.
CityOH
-
Closes
Aug 10, 2026
Construction of a gravity and low pressure sewer system with collected wastewater pumped to the city. A collection pump station will be constructed on the south end of the project area on the west site of SR-103 and north site of sharpless ditch. The pump station will be a suction lift pump station.