New York State Office of General Services
State AgencyNY
Posted
Nov 17, 2026
Dec 23, 2026
Description: Engineering consulting services to investigate, model, evaluate, design, and prepare specifications for a fish barrier at East Vermillion Lake Dam to prevent invasive carp passage.
State · SD, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from State of South Dakota.
Adjacent opportunities open for bidding right now.
New York State Office of General Services
State AgencyNY
Posted
Nov 17, 2026
Dec 23, 2026
Rehabilitate Dryden Lake Outlet Dam.
Posted
-
Dec 2, 2026
Work shall include the excavation of a large portion of the big bone lake dam embankment which will be replaced by a roughened channel. The base bid work shall also include clearing of trees and vegetation, installing erosion control measures, staged drawdown and excavation of the big bone embankment, construction of a roughened channel with a cross vane placed at the start, grading of three tributaries with woody debris drop structures, construction of a wood toe for stream bank protection, placement of excavated material in five designated spoil embankments, and site restoration and planting.
CountyNY
Posted
Nov 12, 2026
Dec 10, 2026
Orange County seeks a consulting firm to assess Beaver Dam Lake and its watershed, monitor water quality, and prepare a long-term lake management plan. The lake is located in the towns of Blooming Grove, Cornwall, and New Windsor. The contract is for three years, with options for one or two additional years.
CountyGA
Posted
Oct 21, 2026
Dec 9, 2026
This Project includes the following Work: Rehabilitation of a low-hazard (Category II) dam in Tribble Mill Park including: installing and maintaining erosion control measures, temporary access roads, and temporary pedestrian access measures; draining the lake, constructing a cofferdam, and installing and maintaining a water diversion system; demolition of the existing concrete riser, concrete impact basin, and portions of the spillway pipe and internal drain system adjacent to the riser and impact basin; constructing a new concrete riser, concrete impact basin, rip-rap outlet channel, and portions of the spillway pipe and internal drain system adjacent to the riser and impact basin; installing a cured-in-place pipe lining within the spillway pipe; removing trees (including root balls) from portions of the dam and auxiliary spillway, performing surface repairs and minor grading, and establishing grass cover; and removing all temporary facilities and restoring the site including erosion control measures, temporary access roads, temporary pedestrian access measures, and coffer dam.