Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
River Plantation Mud
The River Plantation Municipal Utility District is seeking bids for rehabilitation of an existing channel, including concrete lining and storm sewer replacements. A non-mandatory pre-bid will be held remotely, and bids will be opened electronically on CIVCAST.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Emerald Forest Utility District
Emerald Forest Utility District is seeking bids to rehabilitate the Linnfield Detention Basin, including installation of ShoreSOX erosion control along the basin side slopes, repair of existing interceptors, and tree trimming along the west fence line. Bids will be opened electronically by Vogler and Spencer Engineering, with a non-mandatory teleconference pre-bid meeting on 2025-11-19.
Posted Date
-
Due Date
Dec 5, 2025
Emerald Forest Utility District
Close: Dec 5, 2025
Emerald Forest Utility District is seeking bids to rehabilitate the Linnfield Detention Basin, including installation of ShoreSOX erosion control along the basin side slopes, repair of existing interceptors, and tree trimming along the west fence line. Bids will be opened electronically by Vogler and Spencer Engineering, with a non-mandatory teleconference pre-bid meeting on 2025-11-19.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Harris County Mud 401
Work includes sand blast and recoat aboveground piping; remove and replace wet well vertical piping including supports; remove existing t-lock liner and recoat wet well. Includes by-pass pumping.
Posted Date
-
Due Date
Dec 12, 2025
Harris County Mud 401
Close: Dec 12, 2025
Work includes sand blast and recoat aboveground piping; remove and replace wet well vertical piping including supports; remove existing t-lock liner and recoat wet well. Includes by-pass pumping.
AvailableCity of New Port Richey
Work includes oxidation ditch remediation, pressure wash interior and exterior walls, and basin slab floor, remove and replace all interior and exterior expansion joint filler and sealer materials, seal the minor and major cracks in the concrete basin walls, clean and repair all concrete spalling on basin walls, oxidation ditch mechanical improvements, remove existing mechanical aerators and replace with new equipment, remove existing effluent weir gate and replace with new equipment.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
City of New Port Richey
Close: Dec 11, 2025
Work includes oxidation ditch remediation, pressure wash interior and exterior walls, and basin slab floor, remove and replace all interior and exterior expansion joint filler and sealer materials, seal the minor and major cracks in the concrete basin walls, clean and repair all concrete spalling on basin walls, oxidation ditch mechanical improvements, remove existing mechanical aerators and replace with new equipment, remove existing effluent weir gate and replace with new equipment.
AvailableEast Central Sud
Construction of new east central special utility district office building additions.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
East Central Sud
Close: Dec 11, 2025
Construction of new east central special utility district office building additions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →