CityFL
Posted
Oct 29, 2026
Nov 23, 2026
Description: DYS is seeking a contractor to install two independent 75-amp, 208-volt single-phase electrical circuits with fused service disconnects and twist-lock receptacles, along with a properly sized compressed-air line and air dryer at the Indian River Juvenile Correctional Facility. The work also requires an extra conductor in each conduit run for potential future conversion to three-phase service and includes permits, inspections, as-built drawings, testing, and commissioning. Bidders must attend a mandatory site visit, submit the overall project price including a 10% contingency and the cost template, and keep quotes valid for at least 60 days.
StateAgency · OH, US
Decision makers connected to this RFP from Ohio Department of Youth Services.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityFL
Posted
Oct 29, 2026
Nov 23, 2026
Includes the replacement of all corroded rigid metal conduit (RMC) with marine-grade Rigid Aluminum Conduit, replacement of deteriorated electrical fittings, removal and replacement of electrical conduit and fuel/vent piping entry boots, repair of product piping entry boots at the gasoline and diesel STP sumps using ICON, raising of all electrical fittings and seal-offs to a minimum of 6 inches above the finished dock/concrete surface, coordinate and pass all required inspection hold points with the Engineer, Owner, and Florida DEP representative.
CountyMD
Posted
Sep 2, 2026
Dec 1, 2026
Electrical repairs, replacements and new installation.
Cuny Laguardia Community College
Higher EducationNY
Posted
Oct 22, 2026
Nov 30, 2026
Qualified contractors for the installation of ADA-accessible fastlane glassgate turnstile lanes at various locations across campus.
FederalVA
Posted
Nov 16, 2026
Nov 23, 2026
The Defense Logistics Agency Aviation is requesting one electrical kit, shop set installation (NSN 5975-01-417-3267) under solicitation SPE4A0-27-T-0639. The solicitation also includes a contractor first-article-testing line item. The stated delivery period is 75 days after award, and quotations are due November 23, 2026.