Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of drainage improvements to the outfall and other miscellaneous work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of labor, materials, and equipment for the construction of drainage improvements, including 8-inch and 4-inch IPS HDPE force main pipe installation, lift stations, electrical work, grading, excavation, and erosion control.
Posted Date
Dec 30, 2025
Due Date
Feb 5, 2026
Release: Dec 30, 2025
Close: Feb 5, 2026
Procurement of labor, materials, and equipment for the construction of drainage improvements, including 8-inch and 4-inch IPS HDPE force main pipe installation, lift stations, electrical work, grading, excavation, and erosion control.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of 8" nominal dimension IPS HDPE force main pipe to be installed by horizontal directional drilling (HDD) and a 4" nominal dimension IPS HDPE force main pipe by open trench construction. Other site work includes lift stations, electrical work, grading, temporary shoring, excavation, installation of drainpipe and structures, concrete work, plantings, and erosion control.
Posted Date
Dec 30, 2025
Due Date
Feb 5, 2026
Release: Dec 30, 2025
Close: Feb 5, 2026
Project consists of 8" nominal dimension IPS HDPE force main pipe to be installed by horizontal directional drilling (HDD) and a 4" nominal dimension IPS HDPE force main pipe by open trench construction. Other site work includes lift stations, electrical work, grading, temporary shoring, excavation, installation of drainpipe and structures, concrete work, plantings, and erosion control.
AvailableWork includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Work includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
AvailableOutfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Posted Date
Dec 15, 2025
Due Date
Feb 3, 2026
Release: Dec 15, 2025
Close: Feb 3, 2026
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.