CountyGA
Jul 20, 2026
Closes
Aug 19, 2026
Valve and Wet Tap Installation Services (Three (3) Year Multiyear Contract)
Work includes providing routine and emergency valve and wet tap installation services. Services include installation on active water mains, trench excavation and shoring, hydrostatic pressure testing, traffic control, site restoration, and related work. 5 ea hydra-stop insertion sleeve and valve, 6" - in street, without excavation, 10 ea hydra-stop insertion sleeve and valve, 6" - behind curb, without excavation, 15 ea hydra-stop insertion sleeve and valve, 6" - in street, with excavation, 10 ea hydra-stop insertion sleeve and valve, 6" - behind curb, with excavation, 10 ea hydra-stop insertion sleeve and valve, 8" - in street, without excavation.