Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of replacement of the line 100w prv vault including vault with 2 - 12" prvs, 1 - 4" prv, and 1 - 6" relief valve and SCADA systems, rehabilitation of the dry fork prv vault including - 1 - 12" prv, 1 - 4" prv, and 1- 8" relief valve, electrical upgrades to the dry fork no. 1 pump station including 80kw portable generator and manual transfer switch, upgrades to the dry fork no. 2 pump station including to three (3) hydropneumatics tanks, new variable frequency drive starters, a 20kw portable generator and a manual transfer switch, along with all related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the construction of improvements and upgrades to the Elswick Street Pump Station and Route 6 Pump Station, involving the removal and disposal of existing equipment, abandonment of a wet well, and the installation of new submersible pumps, a wet well, a valve vault, piping, valves, an electric generator, and associated electrical and instrumentation work.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
This RFP is for the construction of improvements and upgrades to the Elswick Street Pump Station and Route 6 Pump Station, involving the removal and disposal of existing equipment, abandonment of a wet well, and the installation of new submersible pumps, a wet well, a valve vault, piping, valves, an electric generator, and associated electrical and instrumentation work.
AvailableThe Cape Fear Public Utility Authority is soliciting bids for the River Road Booster Pump Station & Waterline Interconnect project, which involves construction of a water booster pump station and installation of a waterline interconnect including pipe installation, fittings, valves, and erosion/sediment control. The procurement is an Invitation for Bid with a total base bid range reported on the aggregator between approximately $4,405,925.00 and $5,700,000.00 and an AI-estimated budget of $4,000,000 – $6,000,000. Contractors are required to submit a lump sum bid with unit price items and allowances and to follow documentation available from the buyer site linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 4, 2026
Release: Dec 4, 2025
Close: Jan 4, 2026
The Cape Fear Public Utility Authority is soliciting bids for the River Road Booster Pump Station & Waterline Interconnect project, which involves construction of a water booster pump station and installation of a waterline interconnect including pipe installation, fittings, valves, and erosion/sediment control. The procurement is an Invitation for Bid with a total base bid range reported on the aggregator between approximately $4,405,925.00 and $5,700,000.00 and an AI-estimated budget of $4,000,000 – $6,000,000. Contractors are required to submit a lump sum bid with unit price items and allowances and to follow documentation available from the buyer site linked from the aggregator.
Single-prime construction contract for rehabilitation of Dewey Street dry weather pump station and associated forcemain: CIPP lining ~3,600 LF of 36" force main; installation of new dry-weather pumps; wet well top slab reconstruction; existing building demolitions; electrical upgrades; monorail crane installation. Bid security of 5% required and contractors must submit an affirmative action plan.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Single-prime construction contract for rehabilitation of Dewey Street dry weather pump station and associated forcemain: CIPP lining ~3,600 LF of 36" force main; installation of new dry-weather pumps; wet well top slab reconstruction; existing building demolitions; electrical upgrades; monorail crane installation. Bid security of 5% required and contractors must submit an affirmative action plan.
Construction services for upgrades to an irrigation pump station, including replacement of pumps, control valves, piping, electrical components, and installation of a hydropneumatic tank and air compressor.
Posted Date
Nov 26, 2025
Due Date
Jan 13, 2026
Release: Nov 26, 2025
Close: Jan 13, 2026
Construction services for upgrades to an irrigation pump station, including replacement of pumps, control valves, piping, electrical components, and installation of a hydropneumatic tank and air compressor.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis